Mobile Impact Crusher + Screener – Turning Waste into Wealth

Release time:2026-07-02     Visits:3

Urban renewal projects generate large amounts of waste concrete and bricks. Disposal costs money, but these materials are simply resources in the wrong place. With an impact crusher and vibrating screen, construction waste can be processed into four sizes of recycled aggregates for reuse.

I. What Can Be Recovered?

Construction waste mainly consists of C20–C40 concrete blocks. After crushing and screening:

Recycled aggregates are already widely used in construction and road repair.

II. Equipment: Impact Crusher + Screener – Two Machines Are Enough

For concrete up to C40, an impact crusher + vibrating screen is sufficient – no jaw or cone crusher needed. Concrete has poor impact resistance; the impact crusher uses high-speed impact to break it efficiently, producing good particle shape and fewer flaky particles.

III. Critical but Often Overlooked: Iron Removal

Waste concrete contains rebar, wires, and embedded steel. If they enter the crusher, they can damage hammers or jam the rotor. Mobile impact crushers are equipped with a permanent magnetic separator that automatically removes iron on the conveyor belt. Benefits:

IV. Mobile Advantage: The Job Site Becomes the Factory

Construction waste is scattered, and transport is expensive. Track-mounted mobile impact crusher + mobile screener can be deployed directly on site: excavator feeds, crusher crushes and removes iron, screener grades, and finished aggregates are loaded directly. No foundation, no external power, no conveyor maintenance – just one loader and two machines.

V. Real-World Case

In a city redevelopment project, demolished C30–C40 concrete beams and slabs were processed using an SF-380D mobile impact crusher and SS-7018 mobile screener. Capacity: ~180–200 t/h, producing three sizes (0–5, 5–12, 12–23mm). About 15 kg of scrap steel was recovered per ton of feed. Recycled aggregates were sold to brick plants and road contractors, and scrap steel was sold separately – the project was highly profitable.

VI. Economic Estimate

At 2,000 tons/day:

VII. Conclusion

Construction waste recycling is a proven business model. Key points:

If you are considering entering this field or have demolition waste to process, contact us. Suhman offers complete solutions from equipment selection to process design.